Cranes that handle “energy”
Two cranes were used to retrieve a voltaic pile. This was an operation which involved the use of a heavy-duty crane, namely the F800AXP, and a light-duty crane, the F95A.
The pile was collected in a ditch on the roadside using an F800AXP crane, a very high-performance machine, capable of performing demanding handling at a distance. The crane was chosen due to the difficult logistics of the operation: the pile was on a cliff among several trees. Along the power line, piles could also be collected on the roadside thanks to the use of the F95 crane.
- Sector Logistic
- Related company
From Project to Reality
Other Case Histories